SMS Limited

Electrical

ELECTRICAL VERTICAL since its Inception at SMS Limited in 2009 executed more than 2500 Crores value of works in Transmission and Distributions Sectors.

EPC contracts under turnkey basis in various Private/ Public Sector units in India. Major works taken up/ executed by SMSL in various states Transmission and Distribution boards. Electrical vertical received Prime Minister’s award for excellence in Public Administration for outstanding achievements in implementation of priority programmes of Government of India for the project executed in RGGVY scheme in Nalanda, Bihar.

Electrical Vertical also did a commendable job throughout the project execution, timely supply of the best quality materials, deployment of adequate and well experienced staff and officers. Usages of unconventional transportation modes.  Timely execution of tendering formalities , relaxation in inspection criteria for petty items without compromising quality, removing delay in pre dispatch inspection were some of many proactive policy decisions made at the headquarter level.

KEY PROJECTS

Work In Hand

Project Name :-Kondapuram UG Coal mine, SCCL Telangana

Clients :-SCCL

Name of Work :-Extraction of Coal with Continuous Miner at Kondapuam, SCCL Telangana

Extraction of Coal on cost per ton basis by deploying Continuous Miners including the Drivage of Tunnels at Kondapuram UG Coal Mine, Manuguru Area, SCCL, Telangana (10 Years)

Project Name :- Tummalapalle Project , Part-2 Andhra Pradesh

Clients :- UCIL

Name of Work :- Development Stopping, Ventilation Shaft Sinking & other related Excavation for Production of 3000 TPD of Uranium Ore at Tummalapalle Project , Andhra Pradesh.

Mine development and operation for UCIL- India’s largest fully Mechanized underground mine in Andhra Pradesh, producing Uranium ore by deploying the latest state of the art technology and deploying highly sophisticated equipment from India, Canada, Finland, USA, France.

Development Stopping, Ventilation Shaft Sinking & other related Excavation for Production of 3000 TPD of Uranium Ore at Tummalapalle Project, UCIL, Andhra Pradesh (10 Year Project)

Project Name :- Malanjkhand Copper Project, Balaghat, Madhya Pradesh

Clients :- HCL

Name of Work :- Mine Development, Production Drilling and Ore Production from MCP underground mine, Madhya Pradesh.

Development, Production Drilling and Ore Production at Malanjkhand Underground Mine, Madhya Pradesh, India (5 Years)

Project Name :- Banwas Block of Khetri Copper Mine, Rajasthan

Clients :- HCL

Name of Work :- 27,00,000 MT Ore Production along with Mine Development, Decline Development, Diamond Drilling for exploration including sampling in Development and Stopes, Production Drilling of Large Dia. (165 mm, 115 mm) Drilling & Long Hole (57 mm) Drilling, Drop Raising & equipping at Banwas Block of Khetri Copper Mine, Rajasthan.

Project Name :- KETKI Expansion UG Coal Mine, SECL

Clients :- SECL

Name of Work :- MINE DEVELOPMENT AND OPERATION OF KETKI Expansion UG MINE ON MDO BASIS, Chhattisgarh, India

Project Name :- Shivani UG Coal Mine, SECL

Clients :- SECL

Name of Work :- Introduction of Two Set of Low Height continuous Miner (LHCM) Package for winning coal without blasting from the district(s) in Shivani UG Mine, Chhattisgarh, India

KEY PROJECTS

Completed

Infrastructure Plan Phase-I Project, Kalyan Zone.
• Awarded in 2008
• Authority Maharashtra State Electricity Distribution Company Limited
• Project in brief Turnkey contract for Infrastructure Plan Phase – I Project, Kalyan Zone. (Total 22kV Switching S/S- 6Nos, 22KV O/H Line- 694.61KM, 22kV U/G Cable-60.010KM, DTC- 985Nos, LT O/H Line-238.78KM, LT U/G Line-4.4KM and other Misc Work)

BACKLOG WORKS, YAVATMAL
• Awarded in 2008
• Authority Maharashtra State Electricity Distribution Company Limited
• Project in brief Turnkey Contract for the works of new 33/11 KV Sub-stations under Yavatmal Circle. 33KV S/S- 7nos, 11kV Bays- 2nos., 33kV & 11kV O/H Line-142.1KM, 11kV Cap. Bank S/S- 3nos.

Infrastructure Plan Phase – II Project, Kalyan & Dombivali Division – Kalyan Zone.
• Awarded in 2009
• Authority Maharashtra State Electricity Distribution Company Limited
• Project in brief Turnkey contract for Infrastructure Plan Phase – II Project, Kalyan & Dombivali Division – Kalyan Zone. (Total 22kV Switching S/S- 2Nos, 22KV RMU-29nos, 22KV O/H Line- 21.34KM, 22kV U/G Cable-91.69KM, DTC- 193Nos, LT O/H Line-28.70KM, LT U/G Line-128.82KM and other Misc Work)

Infrastructure Plan Phase – II Project, Morshi, Amravati Zone.
• Awarded in 2009
• Authority Maharashtra State Electricity Distribution Company Limited
• Project in brief Turnkey contract for Infrastructure Plan Phase – II Project, Amravati Zone. (Total 33kV S/S & FDR- 24Nos, 33KV O/H Line- 50.90KM, 33kV U/G Cable-0.62KM, 11KV O/H Line- 430.01KM, 11kV U/G Cable-4.92KM, DTC- 1062Nos, LT Line-209.92, other Misc Work)

Dipka OCP Expansion (SECL), 132kV Power Trans. Bays
• Awarded in 2009
• Authority South Eastern Coalfields Limited
• Project in brief Turnkey basis for Dipka OCP Expansion (SECL), 132kV Power Trans. Bays- 2 nos, 132kV Line Bays- 2 nos, 30/36MVA Power Transformer- 2 Nos, 33kV Outgoing Bays (2 I/C+1B/C, 8O/G)- 11Nos

MSPL-132kV Bay at MSETCL Seloo Substation
• Awarded in 2011
• Authority Mahatma Sugar Pvt. Ltd, Wardha
• Project in brief Supply of Equipments & Machinery for 132kV Bay at MSETCL Seloo Substation, 13.5KMS 132kV S/C Line on D/C Tower and 132kV Bay at MSPL Plant Jamni Substation. Civil Work, Erection, Testing & Commissioning for 132kV Bay at MSETCL Seloo Substation, 13.5KMS 132kV S/C Line on D/C Tower and 132kV Bay at MSPL Plant Jamni Substation.

INFRA, GADCHIROLI, Infrastructure Plan Phase – II Project, Allapali and Gadchiroli
• Awarded in 2011
• Authority Maharashtra State Electricity Distribution Company Limited
• Project in brief (INFRA-IIA) Turnkey Contract of Infrastructure Plan Phase-IIA in Allapali & Gadchiroli Divisionunder Gadchiroli Circle of Nagpur Zone

Restructured Accelerated Power Development and Reforms Programme Part B, DOMBIVALI
• Awarded in 2011
• Authority Maharashtra State Electricity Distribution Company Limited
• Project in brief (R-APDRP) Turnkey Contract for R-APDRP Part B Scheme works under Kalyan- Dombivali (KZ) (22kV Switching-Stations- 6 Nos, 22kV Lines- 72.75KM, New DTC’s-333Nos, Aug. of Trans.-308 Nos, Aug. Lines-88.11 KM, HT U/G Cable- 240.6 KM, LT U/G Cable- 573.79, HT/T Pole Replacement- 1515 Nos. )

PSI Scheam, BULDHANA
• Awarded in 2012
• Authority Maharashtra State Electricity Distribution Company Limited
• Project in brief Turnkey Contract for 9Nos. Of 33/11kV Sub-Stations & allied works under Buldhana Circle Under Amravati Zone. (Total 33kV S/S- 10Nos, 33kV FDR Bay- 1No, 11KV O/H Line- 36.65KM, 11kV Station Cap.- 8 nos, 11kV 0.6MVAR Cap-7 nos, Upgradation of 11kV Line -55.70KM & other Misc Work)

Implement system improvement & augmentation scheme for existing Electrical network Under Distribution System under Restructured Accelerated Power Development and Reforms Programme(R-APDRP), KOTA [I]
• Awarded in 2012
• Authority Jaipur Vidyut Vitran Nigam Limited
• Project in brief “To implement system improvement & augmentation scheme for existing Electrical network in KOTA city of Rajasthan on Turnkey basis.” LOT-I in Kota City under R-APDRP Part-B Scheme against TN-38. (New/Augmentation 11 KV O/H Line-26KM, 11kV U/G Cable including Road Crossing -60kM, RMU & Associate Work-88 nos, 11/0.4KV DT Sub-Station-133nos, New/Aug./conversion LT O/H Works- 137.104 kM, LT U/G Cable including Road Crossing -117.05kM, Replacement of Energy Meter- 6509Nos,Retrieval of Material, etc.)

Implement system improvement & augmentation scheme for existing Electrical network Under Distribution System under Restructured Accelerated Power Development and Reforms Programme(R-APDRP), KOTA [III]
• Awarded in 2012
• Authority Jaipur Vidyut Vitran Nigam Limited
• Project in brief “To implement system improvement & augmentation scheme for existing Electrical network in KOTA city of Rajasthan on Turnkey basis.” LOT-III in Kota City under R-APDRP Part-B Scheme against TN-38. (New/Augmentation 11 KV O/H Line-166.85KM, 11kV U/G Cable including Road Crossing -62.56kM, RMU & Associate Work-139 nos, 11/0.4KV DT Sub-Station-225nos, New/Aug./conversion LT O/H Works- 126.25 kM, LT U/G Cable including Road Crossing -17.85kM, Replacement of Energy Meter- 6442Nos,Retrieval of Material, etc.)

System Improvement, Strengthening and Augmentation of Distribution System Works under
Restructured Accelerated Power Development and Reforms Programme(R-APDRP), JODHPUR [II]

• Awarded in 2012
• Authority Jodhpur Vidyut Vitaran Nigam LTD
• Project in brief System Improvement, Strengthening and Augmentation of Distribution System Works for bringing down AT&C Losses and improve quality of consumer supply of Jodhpur City Bikaner City under R-APDRP Part-B Scheme (Lot-I to IX) against TN-TW-146 LOT-II (33KV WORKS) (33/11 KV Sub-Station- 16Nos, 33kV Overhead line-70 KM, HT Cable- 26.81 KM etc)

System Improvement, Strengthening and Augmentation of Distribution System under Restructured Accelerated Power Development and Reforms Programme(R-APDRP) Bikaner (VII)
• Awarded in 2012
• Authority Jodhpur Vidyut Vitaran Nigam LTD
• Project in brief System Improvement, Strengthening and Augmentation of Distribution System Works for bringing down AT&C Losses and improve quality of consumer supply of Jodhpur City Bikaner City under R-APDRP Part-B Scheme (Lot-I to IX) against TN-TW-146 LOT-VII (33KV WORKS) (33/11 KV Sub-Station- 13Nos, 33kV Overhead line-109.57 KM, HT Cable- 72.11 KM)

System Improvement, Strengthening and Augmentation of Distribution System under Restructured Accelerated Power Development and Reforms Programme(R-APDRP) Bikaner (IX)
• Awarded in 2012
• Authority Jodhpur Vidyut Vitaran Nigam LTD
• Project in brief System Improvement, Strengthening and Augmentation of Distribution System Works for bringing down AT&C Losses and improve quality of consumer supply of Jodhpur City Bikaner City under R-APDRP Part-B Scheme (Lot-I to IX) against TN-TW-146 LOT-IX (11KV WORKS) (11kV Overhead line-209 KM, HT Cable- 128.8 KM, LT Cable- 43.19 KM, Distribution & Service Boxes- 6155Nos, PCC Pole- 4184 Nos.)

The Work Of Village Electrification On Turn Key Basis In The District Of Nalanda, State Of Bihar Under Rajiv Gandhi Grammin Vidutikaran Yojana (RGGVY)
• Awarded in 2013
• Authority South Bihar Power Distribution Company Limited
• Project in brief Bihar for installation/erection including associated civil and works, testing commissioning including performance testing of all the equipments supplied under the supply contract and all other services specified on Turnkey Basis under Rajiv Gandhi Grameen Vidyutikaran Yojana [SBPDCL & BRGF]

System Strengthening works in 10 (ten) districts in Rajasthan under Integrated power Development Scheme. (IPDS)-Shri Ganganagar
• Awarded in 2017
• Authority Jodhpur Vidyut Vitaran Nigam LTD
• Project in brief Supply & Erection contract for execution of works of system strengthening of sub-transmission & distribution network, including net metering , metering of feeders/distribution ransformers /consumers and other in Shriganganagar District of Rajasthan under Jodhpur Discom under IPDS Scheme on turnkey basis.

Our Clients

Gallery