SMS Limited

Railways

Railways are the lifelines of a nation’s economy and urban transit is key to sustainable urbanization. As one of India’s foremost builders of Railways infrastructure, we offer turnkey Design-and-Build and EPC solutions with single point responsibility covering the entire ambit of design, engineering, supply, project planning, quality control and execution. Our range of services include Integrated / Composite Railways Projects, Dedicated Freight Corridors, Conventional & Ballastless Track Works, Railway Electrification, Signalling & Telecommunication Systems, Urban Rail Mass Transit Systems (Metro/Monorail), Bridges, Tunnels, Underground & Elevated Stations.

KEY PROJECTS

Work In Hand

Tinaighat [KM. 11.575] [INCLUDING] and Castlerock [KM. 24.600] [INCLUDING] in Hubballi Division of South Western Railway in Karnataka State, India.

• Awarded in 2018
• Authority – RVNL, Bangalore.
• Project in brief – 

  • Project: Doubling railway tracks Tinaighat to Castlerock, Karnataka, India
  • Scope: Construction of roadbed, bridges, service buildings, and electrical works
  • Compliance and Management: Adherence to railway standards, coordination, safety, and documentation.

Rewa Tunnel, Construction of Tunnel No 02

• 2019
• Authority –West central Railway
• Project in brief – 

  • Project: Construction of tunnels for Rewa-Sidhi new BG Rail Line Project
  • Tunnels:
    - Tunnel No. 02: Ch: 78333m to 78625m
    - Tunnel No. 03: Ch: 81622m to 82096.90m
    - Tunnel No. 04: Ch: 83184.625m to 83461.95m
    - Approximate total length: 1044.20 RM
  • Location: Churhat - Sidhhi stations, Sone Bridge area
  • Exclusion: Ch: 79400m to 79800m of Sone Bridge

Indore Budhni, Construction of Road Over Bridges, Road Under Bridges.

• 2020
• Authority –Rail Vikas Nigam Limited
• Project in brief

  • Project: Construction of bridges for new electrified BG railway line
  • Route: Mangliyagaon (Indore) - Budni stations, Madhya Pradesh, India
  • Divisions: Ratlam (Western Railway) and Bhopal (West Central Railway)
  • Scope: ROBs, RUBs, major waterway bridges
  • Packages: Split into 2 for efficiency.

Rites Gevra , Earthwork in Formation, Minor Bridges

• 2021
• Authority –Rites Limited
• Project in brief

  • Project: Earthwork, minor bridges, P. Way linking, and supply of track materials for feeder line of East West Rail Corridor
  • Location: Gevra Opencast, Gevra Area, SECL (South Eastern Coalfields Limited)
  • Scope: Earthwork in formation, minor bridges, P. Way linking, supply of track materials (ballast, PSC sleepers, fittings, points & crossings), drainage, road, FOB (foot over bridges), geotechnical investigation
  • Purpose: Facilitate coal evacuation through rail within the leasehold boundary of the project.

Wardha Sindhi, Earthwork in formation, Construction of Minor Bridges

• 2023
• Authority –Central Railway
• Project in brief

  • Project: Earthwork, minor bridge construction, and side drain installation
  • Section: Wardha-Sindi (31km) for Wardha Nagpur 3rd & 4th line
  • Purpose: Expansion of railway capacity for Wardha-Nagpur route.

KEY PROJECTS

Completed

Meja TPP ( 2X660 MW), Meja, District: Allahabad, State: Uttar Pradesh, Package- 2


Awarded in 2014
Authority rated ALLAHABAD.
Project in brief – Earthwork in Formation, Construction of Bridges from Km. 12/000 to 25/500 (Outside Plant) in connection with Construction of Railway Siding for MUNPL, Meja TPP ( 2X660 MW), Meja, District: Allahabad, State: Uttar Pradesh, Package- 2.

Const. of Roadbed & Minor Bridges between Dallirajhara to Rowghat section in C.G.


• Awarded in 2009
• Authority RVNL.
• Project in brief – Construction of roadbed, supply of ballast, major & minor bridges, Residential and service buildings & general electrical work etc. for Dallirajhara – Keoti section (42 km) in connection with a new rail link between Dallirajhara and Rowghat in Raipur Division of South East Central Railway in the state of Chhattisgarh, India.

New BG line between Bidar – Gulbarga Stations – Proposed Construction of BG Single line Railway Tunnel

• Awarded in 2015
• Authority – SCR.
• Project in brief – Construction of new BG line between Bidar – Gulbarga stations – Proposed construction of BG single line Railway Tunnel (4.925 x 7.70m approx. clear dimensions, ‘D’ shaped) from k 58.400 M to 60200M (Approximate total length 1800 RM) (Tunnel proper: Approx.1500 RM) including construction of Portals (2 x 25.0M) on both ends. False portals (25.0M on Bidar end and 100.0M on Gulbarga end), shotcreting, steel fiber reinforced shortcrete, retaining walls, construction of side drains, etc between Marugutti (H) and Kamalapur stations. Near Marugutti Reserve Forest in Karnataka State.

Construction of Roadbed, a supply of ballast, Bridges, residential and service buildings for Dallirajhara- Keoti section

• Awarded in 2015
• Authority – RVNL Raipur
• Project in brief – “Execution Of Works Of Roadbed, Major And Minor Bridges, Supply Of Ballast, Residential And Service Buildings, Platform, Transportation Of Materials, General Electrical Etc, For Dondi – Keoti Section( I.E.. From 17.6 Km. To 42.6 Km – Total Length – 25 Kms ) In Connection With Dallirajhara – Rowghat New B.G. Rail Line Project In Raipur Division Of South East Central Railway In The State Of Chattisgarh, “India”.

KRL- Lara Section of NTPC Railway Siding, in Raigarh District, Chhattisgarh State (Package – II B).

• Awarded in 2018
• Authority – Rites Raigarh.
• Project in brief – Execution of Earthwork in formation, Construction of Minor Bridges, Blanketing, P. Way linking works including supply of P-way fittings, Track ballast, PSC Sleeper and Points & Crossings in connection with construction of Railway Infrastructure from 12/000 KM LP to 18/610 KM LP, KRL- Lara Section of NTPC Railway Siding, in Raigarh District, Chhattisgarh State (Package – II B).

AKALKOT ROAD and GULBARGA stations (78 Kms), is part of Hotgi-Gulbarga Section

• Awarded in 2016
• Authority RVNL
 Project in brief – Balance works for construction of roadbed, major and minor bridges, track linking (excluding supply of rails, ordinary track sleepers, and thick web switches), outdoor signaling, and electrical(general) works in connection with doubling of Akalkot Road-Gulbarga section (78 kms) of Hotgi-Gulbarga section in Solapur Division of Central Railway in the States of Maharashtra & Karnataka, India.

Construction of Roadbed, Minor & Major bridges between km. 10.00 to Km. 45.00 in connection with New B.G electrified double line in the state of Chhattisgarh over South East Central Railway between Kharsia -Dharamjaygarh

• Awarded in 2015
• Authority – IRCON
• Project in brief – “Construction of roadbed, minor and major bridges km.10 to km.45 ln connection with new B.G. electrified line railway track in the state of Chhattisgarh over South East Central Railway between Kharsia-Dharamjaygarh.

N.F.Railway Tunnel no.7

• Awarded in 2012
• Authority – North Frontier Railway.
• Project in brief – Construction of single line BG tunnel no.7 (app. total length 1780 rm) at Km.36.640 to Km. 38.420 in between station Kambiron road and Thingou in connection with the construction of new railway line project Jiribam – Tupul(Imphal) of N.F.Railway (Construction).

Our Clients