SMS Limited

Infrastructure

KEY PROJECTS

Work In Hand

Battisa Nallah Gravity Dam across Battisa Nallah

  • Awarded in 2018.
  • Authority WRD Rajasthan.
  • Project in brief – Construction of Battisa Nallah Gravity Dam across Battisa Nallah on Engineering, Procurement and Construction (E.P.C) single Responsibility turnkey basis, near village Deldar of tehsil of Aburoad, Sirohi District in the State of Rajasthan India.

Purna Barrage – 2 (Ner Dhamna)

  • Awarded in 2012.
  • Authority Vidharbha Irrigation Department Corporation (VIDC), Maharashtra India.
  • Project in brief – Purna Barrage – 2 (Ner Dhamma) Tq. Telhara Dist. Akola. Construction of Barrage, Approach Bridge on L/S and R/S, Jackwell, Pump House, Rising Main, Delivery Chamber, allied Earthwork & other works.

Wardha Barrage (Hadgaon) Lift Irrigation Scheme

 

  • Awarded in 2012.
  • Authority Vidharbha Irrigation Department Corporation (VIDC), Maharashtra India.
  • Project in brief – Wardha Barrage (Hadgaon) Lift Irrigation Scheme Tq. Babhulgaon Dist. Yavatmal Construction of Barrage Jack Well and Pump House and Raising Main with allied works.

Lower Pedhi

  • Awarded in 2006.
  • Authority WRD Maharashtra.
  • Project in brief – Lower Pedhi Project, Tq Bhatukli, District.Amravati Construction of Earthen Dam, Head Regulator, Spillway and its relevant works.

Construction of H.R. at RD -119 to -49 m and Aqueduct
RD -49 To +780 m (khindsi)

  • Awarded in 2023.
  • Authority Vidarbha Irrigation Development Corporation Nagpur
  • Project in brief – Construction of H.R. at RD -119 to -49 m and Aqueduct
    RD -49 To +780 m, on Khindsi Feeder Canal. Tal.
    Ramtek, Dist. Nagpur.

KEY PROJECTS

Completed

Construction of Roadbed, Minor & Major bridges between km. 10.00 to Km. 45.00 in connection with New B.G electrified double line in the state of Chhattisgarh over South East Central Railway between Kharsia -Dharamjaygarh

• Awarded in 2015
• Authority – IRCON
• Project in brief – “Construction of roadbed, minor and major bridges km.10 to km.45 ln connection with new B.G. electrified line railway track in the state of Chhattisgarh over South East Central Railway between Kharsia-Dharamjaygarh.

Renigunta – Kadapa-Rayalacheruvu, SH-31

• Awarded in 2015
• Authority SKD GNSS Project Circle, KADAPA
• Project in brief – Formation of State Highway (Renigunta-Kadapa-Rayalacheruvu, SH-31) from Settivaripalli village to K.Sugumanchipalli village due to submergence of existing Road under Gandikota Reservoir in Kadapa District (Balance work).

Pench diversion Project

  • Awarded in 2012.
  • Authority– Water Resources Department (M.P).
  • Project in brief – Turnkey construction of a 3.24 km hydraulic tunnel with modified horseshoe shape, from R.D. 9810 m. to R.D. 13050 m., featuring c.c. lining, steel support, and a shaft at R.D. 10860 m. Electrification, lighting, u/s, and d/s transitions, R.C.C. lining, and canal excavation from R.D. 9585 m. to R.D. 9785 m. & R.D. 13090 m. to R.D. 13290 m. included. Located in Chhindwara (M.P.) for the Pench diversion Project's left bank canal, adhering to hydraulics and approved alignment for a designed discharge of 34.10 cumecs.

 

Durg Toll Plaza,NHAI Project,Durg By Pass,Durg Chhattisgarh
• Awarded in 2017
• Authority NHAI
• Project in brief Durg Toll Plaza at Durg Bypass on NH-6 This project is situated in state of Chhattisgarh
First BOT basis project of NHAI
Toll Operation Period of SMSIL – 30 years from 14th December 2000
Two additional toll point at Rasmara and Dhamdha entry point.

Our Clients