KEY PROJECTS – WORK IN HAND

KEY PROJECTS – COMPLETED

IRCON Logo
NHAI logo

Rehabilitation and upgradation of NH-42 (old NH-219) from km.58/600 to 140/680 (Palamaneru to Krishnagiri Border Section)
Awarded in 2015
Authority MORTH Andhra Pradesh
Project in brief – Rehabilitation and upgradation of NH-42 (old NH-219) from km.58/600 to 140/680 (Palamaneru to Krishnagiri Border Section) to two lanes with paved shoulders in the State of Andhra Pradesh.
Upgradation of Umred Bhisi Chimur Warora 3
Upgradation of Umred Bhisi Chimur Warora 2
Upgradation of Umred Bhisi Chimur Warora 1
Upgradation of Umred-Bhisi-Chimur-Warora, NH-353E, Package-I, Malewada to Chimur on EPC mode
Awarded in 2017
Authority North PWD
Project in brief – Upgradation of Umred- Bhisi – Chimur-Warora, NH- 353E, Package-I, Malewada to Chimur, from Km. 16+000 to Km. 47+700 (Design chainage) excluding the 4 lane road of 1.165 km in Chimur town to two lanes with paved shoulders configuration in the state of Maharashtra on EPC mode.
Renigunta Kadapa Rayalacheruvu SH 31-3
Renigunta Kadapa Rayalacheruvu SH 31-2
Renigunta Kadapa Rayalacheruvu SH 31-1
Renigunta – Kadapa-Rayalacheruvu, SH-31
Awarded in 2015
Authority SKD GNSS Project Circle, KADAPA
Project in brief – Formation of State Highway (Renigunta-Kadapa-Rayalacheruvu, SH-31) from Settivaripalli village to K.Sugumanchipalli village due to submergence of existing Road under Gandikota Reservoir in Kadapa District (Balance work).
Pardi Flyover 3
Pardi Flyover 2
Pardi Flyover 1
Pardi Flyover
Awarded in 2015
Authority NHAI
Project in brief – Construction of Flyover at (km 544/650), including ROB in lieu of L.C. No. 72 including Services Roads, Footpath for RCC drains on an Urban link to Nagpur-Raipur road NH-6 (Pardi Octroi Naka to Sant Tukaram Square to APMC Market) on EPC Mode.

Durg bypass on NH – 6-4
Durg bypass on NH – 6-3
Durg bypass on NH – 6-2
Durg bypass on NH – 6-1
Work of Construction, Maintenance and Operation of Durg bypass on NH – 6 on BOT basis in the State of Chhattisgarh.(18 Km Length Four lane )
Awarded in 2011
Authority NHAI
Project in brief – Construction of 6 lane Durg – Raipur bypass Section of NH-53,from Design Chainage 0+000 to 44+500, (Existing Km 329+400 near Tedesera Village to near Khatti Village) (Pkg. A) under Bharatmala Pariyojana (Lot-3/Chhattisgarh/ Package-1, Mumbai – Kolkata economic corridor) in the state of Chhattisgarh on Hybrid Annuity Mode.
Zarap and Patradevei Section of NH-17-4
Zarap and Patradevei Section of NH-17-3
Zarap and Patradevei Section of NH-17-2
Zarap and Patradevei Section of NH-17-1

Awarded in 2007
Authority PWD Maharashtra
Project in brief – Const. of Missing Link from Zarap to Patradevi of Panvel Mahad panji Road NH-17 in Sindhudurg District of Maharashtra State.
Four Laning and Strengthening of the Madurai kanyakumari 3
Four Laning and Strengthening of the Madurai kanyakumari 2
Four Laning and Strengthening of the Madurai kanyakumari 1
Awarded in 2015
Authority MORTH Andhra Pradesh
Project in brief – Four Laning and Strengthening of the Existing lane if NH-7 from km 120.000 to km 160.000 Madurai-Kanyakumari section in the state of Tamilnadu.
Sarkhej Dholka Vataman Pipli Dholera Bhavnagar Road 3
Sarkhej Dholka Vataman Pipli Dholera Bhavnagar Road 2
Sarkhej Dholka Vataman Pipli Dholera Bhavnagar Road 1
Widening & Strengthening to Sarkhej – Dholka – Vataman – Pipli – Dholera – Bhavnagar Road Km. 16/8 to 133/2 (short route)
Awarded in 2011
Authority GSRDC
Project in brief – Widening & Strengthening to Sarkhej – Dholka – Vataman – Pipli – Dholera – Bhavnagar Road Km. 16/8 to 133/2 (short route).
Scroll to Top