AYODHYA-GORAKHPUR OMT PROJECT (AGSTPL)
• Awarded in 2013
• Authority NHAI
• Project in brief – Operation & Maintenance of Ayodhya-Gorakhpur Section ( Km. 137.970 to Km. 252.860) stretch of NH-28. (Total Length 116.101 Km.) in the State of Uttar Pradesh on OMT basis ( Pkg.No. NHAI/OMT/Pkg-11/2011).
MUZAFFARPUR DARBHANGA PURNIA OMT PROJECT
• Awarded in 2015
• Authority NHAI
• Project in brief – Operation & Maintenance of Muzaffarpur-Darbhanga-Purnia Section ( Km. 0.00 to 148.550 and Km. 159.357 to Km. 287.860) (Total Length 277.053 Km.) stretch of NH-57 the State of Bihar on OMT basis (Package No. 20/2013).
Durg Toll Plaza,NHAI Project,Durg By Pass,Durg Chhattisgarh
• Awarded in 2017
• Authority NHAI
• Project in brief Durg Toll Plaza at Durg Bypass on NH-6 This project is situated in state of Chhattisgarh
First BOT basis project of NHAI
Toll Operation Period of SMSIL – 30 years from 14th December 2000
Two additional toll point at Rasmara and Dhamdha entry point.
VIDYASAGAR SETU Toll Plaza, Kolkata
• Awarded in 2012
• Authority HRBC Kolkata
• Project in brief Fully modernised toll plaza
Total Number of Toll lanes – 20 (10 up and 10 down)
Six reversible lanes (3 up and 3 down)
Two ETC lanes or Tag lanes (1 up and 1 down)
Dharamtar Toll Plaza,Alibagh
• Awarded in 2015
• Authority MSRDC
• Project in brief Dharamtar Toll Plaza situated Near Pen, Raigarh, Maharashtra before 30 km. from Alibagh.
Toll plaza has 4 lanes. Two Lanes for Alibagh to Pen and Two lanes for Pen to Alibagh.
Electronically vehicle counting through Vehicle Counting Devices.