Industrial hazardous waste presents a critical environmental challenge, demanding responsible management and disposal practices. Our approach encompasses Direct Land Filling (DLF) for wastes that don’t necessitate stabilization, Land Filling After Treatment (LAT) for those requiring treatment prior to landfill disposal, and Incineration (PGVR) to thermally treat solid and liquid hazardous waste, transforming it into inert slag. Through these methods, we ensure the safe and efficient handling of industrial hazardous waste, prioritizing environmental sustainability and public health.

KEY PROJECTS

Work In Hand

Raipur STP 75, 35 & 90 MLD

• Project in brief – The Project for STP Raipur is based under the project of mission Clean Kharun River, an initiative by Raipur Municipal Corporation. The Funding for the project is under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) by the Chattisgarh Environment Conservation Board. Through this project, water from 7 nallas of the city will be trapped by KT weir at different locations and sewage water will be conveyed to telescopic RCC NP3 pipes interceptor sewer of Length 11420m (700mm to 1800mm Dia) and 350 mm DI pipe to 3 Sewage Treatment Plants of Capacity 75, 35 & 90 MLD each with SBR technology. The scope of work on these plants is EPC, testing, commissioning, trial run and 15 years of Operation & Maintenance.

5 MLD CETP, Butibori

 

  • Project in brief – Butibori is an industrial suburb of Nagpur, India. Due to the saturation of the existing Butibori
    Industrial Area, MIDC is developing a new Greenfield Additional Butibori Industrial Area, located 6 km
    from the existing MIDC area and spread over a total area of 2.217ha.The Greenfield CETP for the area
    has been proposed ahead of industrial development. MIDC has appointed SMS Limited for Design,
    Build and Commissioning of 5 MLD CETP based on MBR technology through competitive bidding
    process

PONDA ENVOCARE LIMITED

  • Project in brief –Ponda Envocare Limited is located at Plot No. 5 & 5A, GIDC Pissurlem, Taluka. Satari Dist. North Goa, Goa. This CHWTSDF project has got all necessary CTOs from state pollution control board for Secured Lanfilling, Incineration and Pre – Processing of Hazardous waste followed by Co – Processing to Cement Kiln. The total area of the project is around 77574 Sqm.

KEY PROJECTS

Completed

CHWTSDF Pune, Nagpur

• Project in brief -Maharashtra Enviro Power Limited is a Special Purpose Vehicle promoted by SMS Ltd. registered under companies’ act 1956 with a target to BUILD, OWN, OPERATE, a Common Hazardous Waste Treatment Storage Disposal Facility (CHWTSDF). MEPL has ISO 14001, OHSAS 18001 and ISO: 9001 certification.  www.smsmepl.com